CASE STUDIES | Foundry Sand Mastered.

Foundry Sand Mastered.

November 19 2018 By Paola Pasteris

Our valued chrome mine clients approached CoalMin earlier in 2018  to assist in increasing their poor Foundry Sand output - (2 200 tons per month)

The solution: After conducting a feasibility study, CoalMin were able to ascertain that the solution lay in the possibility of increased Foundry Sand Production. The aim was to produce +10 000 tons per month.

The outcome: CoalMin met the mandate through providing a solution which included:

• Design

• Installation

• Commissioning and optimisation

• Training of staff and extended operation.

This was all achieved through the core competence of our staff and partners in just one month for the feasibility study and eight months for design, installation, commissioning, optimisation and the training of staff.